1. Dholera at a glance
Dholera is a planned industrial smart city in Ahmedabad district, Gujarat. It is officially called the Dholera Special Investment Region (Dholera SIR or DSIR). It covers 920 sq km, which is larger than Singapore, and is the largest city being built under the Delhi–Mumbai Industrial Corridor (DMIC). The first 22.5 sq km activation area already has roads, water, power and drainage. In 2026 the Ahmedabad–Dholera Expressway opened, the Tata–PSMC semiconductor fab site was notified as an SEZ, a semi-high-speed rail line was approved, and the first aircraft landed at Dholera International Airport.
| What | Greenfield industrial smart city under the Gujarat Special Investment Region Act, 2009 |
| Where | Gulf of Khambhat coast, about 83 km (~45 min) from Ahmedabad by expressway |
| Size | 920 sq km across 22 villages; 422 sq km under town-planning schemes TP1–TP6 |
| Who builds the city | DICDL (Dholera Industrial City Development Ltd): 51% Government of Gujarat, 49% Government of India. Regulator: DSIRDA |
| Status (Oct 2026) | Activation area built · Expressway open · Fab under construction · Airport runway and ATC complete, operations targeted late 2026 (subject to DGCA) |
| How individuals invest | Buy NA (non-agricultural) residential or commercial plots from private developers in and around the SIR. Industrial land is allotted by DICDL, mainly to companies |
On this page: Map & 360° tour · Dubai lesson · DMIC · Four transport modes · Master plan & timeline · Connectivity & ports · Sustainability · Industries · Social & tourism · Land & plots · Sanand lesson · FAQ · Next steps
2. Where Dholera is: map and 360° tour
Dholera sits on flat coastal land at the head of the Gulf of Khambhat, between Ahmedabad, Bhavnagar, Vadodara and Rajkot. The SIR boundary takes in 22 villages of Dholera taluka. The activation area (Town Planning Scheme 2) is at its centre and holds the ABCD administrative building, the fab site and the first trunk utilities. The airport is at Navagam, at the northern edge.
Loading the 360° tour
17 landmarks — tap to jump
ABCD Building: The administrative hub, and home to the city command centre.
Official Dholera SIR virtual tour · Government of Gujarat / DICDL
Map of Dholera SIR showing the activation area, Ahmedabad–Dholera Expressway, Dholera International Airport and Gulf of Khambhat.
Built, not proposed
The infrastructure already standing in the Activation Area
Dholera is easy to sell on renderings. These are the pieces that exist on the ground today, with the capacities published by the development authority.
Administrative and Business Centre for Dholera
ABCD Building
The region’s administrative hub, and home to the City Integrated Operations Centre — the control room from which traffic, utilities and surveillance across the city are monitored in one place.
CIOCCity command centre
Capacities and lengths as published by Dholera Industrial City Development Limited (DICDL), Government of Gujarat. Capital Brix LLP is an authorised sales channel partner for Mirrikh Infratech Pvt. Ltd. and is not connected to DICDL or the Government of Gujarat.
Explore it yourself: Open the full 360° Dholera virtual tour →
3. Why infrastructure comes first: the Dubai lesson
Dubai did not start with towers. It started with a port (Jebel Ali, 1979), a free zone (JAFZA, 1985), an airline and a highway. The skyline along Sheikh Zayed Road came last, after roughly three decades of infrastructure.
Dholera follows the same order: legal framework, then trunk utilities, then expressway, airport and anchor industry. The comparison helps explain how planned cities grow. It does not predict prices. Governance, capital, tax rules and demand drivers in India are very different from Dubai's.
Read the full comparison: Dholera vs Dubai: Why Infrastructure Comes First (and Where the Analogy Breaks)
4. Dholera and the Delhi–Mumbai Industrial Corridor (DMIC)
The DMIC is India's first planned industrial corridor. It began with an India–Japan understanding in December 2006, received in-principle Union Cabinet approval in August 2007, and gained its implementing company, DMICDC (now NICDC), on 7 January 2008. Dholera was approved as a DMIC node in May 2008.
| DMIC fact | Verified figure |
|---|---|
| States covered | 6: Uttar Pradesh, Haryana, Rajasthan, Madhya Pradesh, Gujarat, Maharashtra |
| Estimated programme size | ~US$90–100 billion over many years |
| India–Japan partnership | NICDC is 74% held by Indian public bodies (GoI 49%, HUDCO 19.9%, IIFCL 4.1%, LIC 1%) and 26% by Japan's JBIC¹ |
| Freight backbone | Western Dedicated Freight Corridor, Dadri–JNPT, ~1,506 km. Fully completed 8 Sep 2026 (JICA)² |
| Road backbone | Delhi–Mumbai Expressway: 1,386 km main alignment. 929 km open as of March 2026 (MoRTH)³ |
| Planned nodes | 24: 11 Investment Regions + 13 Industrial Areas. Dholera is the largest⁴ |
Dholera is not on the Delhi–Mumbai Expressway itself. It connects through the dedicated Ahmedabad–Dholera Expressway and Gujarat's state highway network.
5. Why Dholera is DMIC's flagship node: road, rail, air and sea
The Dholera Awareness Program describes Dholera as the largest SIR planned with all four transport modes. The status of each mode today:
| Mode | Dholera link | Status (Oct 2026) |
|---|---|---|
| 🛣️ Road | Ahmedabad–Dholera Expressway (NE-8) | 🟢 Open. Inaugurated 31 Mar 2026 |
| ✈️ Air | Dholera International Airport | 🟡 Runway and ATC complete. First calibration aircraft landed June 2026. Operations targeted late 2026, subject to DGCA licensing |
| 🚆 Rail | Sarkhej–Dholera semi-high-speed rail | 🔵 Approved. Union Cabinet, 13 May 2026, ₹20,667 Cr |
| ⚓ Sea | Ghogha port (~74 km) + Gujarat port network; greenfield port in the India–UAE LoI | 🟢 Existing ports in use · 🔵 New port at LoI stage |
Few industrial cities in India combine all four modes, even on paper. Dholera's road link is already open, and the other three have formal approval or are in progress.
6. Legal framework and master plan
Dholera is a statutory city with its own law, authority and development company. Private layouts do not define it.
| Layer | Detail |
|---|---|
| Law | Gujarat Special Investment Region Act, 2009 (in force 6 Jan 2009) |
| Notification | Dholera SIR notified May 2009: 920 sq km, 22 villages |
| Regulator | DSIRDA (Dholera Special Investment Region Development Authority), constituted 16 Feb 2010 |
| Development company | DICDL, incorporated 28 Jan 2016: 51% Gujarat (via DSIRDA, contributing land) / 49% Centre (via NICDIT, contributing funds) |
| Planning model | Land pooling under Town Planning (TP) Schemes. TP1–TP6 cover 422 sq km. Draft TP schemes were published in 2012 |
| Activation area | 22.54 sq km in TP2, developed and operational. The CCEA approved ₹2,784.83 Cr of trunk infrastructure for it in May 2015 |
| Administration | Dholera is its own taluka of 33 villages, 22 of them inside the SIR⁵ |
Land-use mix in the Development Plan includes industrial, residential, commercial, logistics, knowledge/IT, recreation and green zones, plus a dedicated city centre. Before buying, check which zone and TP scheme a plot falls in. That decides what can be built on it.
Dholera milestones, 2006–2026
Twenty years of verified milestones, from the India–Japan corridor idea to the expressway, the fab SEZ and the completed freight corridor. Scroll through them below.
The idea
India and Japan agree on an industrial corridor. The Union Cabinet approves DMIC in principle.
The builder
DMICDC — now NICDC — is incorporated. Dholera is chosen as a node.
The law
Gujarat’s SIR Act takes effect. Nine hundred twenty square kilometres are notified as Dholera SIR.
The plan
DSIRDA is formed. The Development Plan and Town Planning Schemes 1–6 are drafted.
The money
The Cabinet Committee on Economic Affairs funds trunk infrastructure for the activation area.
The company
DICDL is incorporated — fifty-one percent Gujarat, forty-nine percent Centre.
Power & plane
Three hundred megawatts of solar go live. Airport Phase 1 is approved at ₹1,305 Cr.
The chip
Cabinet approves the Tata–PSMC fab. Foundation stone follows two weeks later.
Global & road
India–UAE letter of intent for Dholera. The Ahmedabad–Dholera Expressway opens — eighty-three kilometres, about forty-five minutes.
Book a site visitRail & SEZ
Fab SEZ notified. Semi-high-speed rail approved at ₹20,667 Cr. First calibration aircraft lands at Dholera.
Corridor complete
Gujarat’s Data Centre Policy names Dholera a priority hub. The Western Dedicated Freight Corridor is fully completed.
Today
This is where we are.
Expressway. SEZ. Aircraft. Freight corridor. Ready when you are.
Learn moreCited from official sources. Not investment advice.
Every card links to its official source (PIB, NICDC, DICDL, JICA or the company).
7. Connectivity: expressway, airport, rail and ports
Ahmedabad–Dholera Expressway (NE-8): open
- Opened: public trial use from 27 Feb 2026; inaugurated 31 Mar 2026
- Design: 4-lane access-controlled, expandable to 8 lanes; ~109 km total length
- Ahmedabad → Dholera: about 83 km, ~45 minutes (PIB)⁶
More detail: Ahmedabad–Dholera Expressway guide
Dholera International Airport: nearly ready
- Approved: CCEA, 14 Jun 2022, Phase-1 cost ₹1,305 Cr
- Developer: Dholera International Airport Company Ltd (AAI 51% · Gujarat 33% · NICDIT 16%)
- Site: ~1,426 ha at Navagam; Phase-1 runway 3,200 m⁷
- Progress: runway, taxiway and ATC complete; first calibration aircraft landed June 2026
- Operations: targeted late 2026, subject to DGCA licensing
- Why cargo matters: Gujarat handles about 40% of India's ocean cargo and 18–20% of its industrial output, so air freight has an established base to draw on
More detail: Dholera International Airport guide
Sarkhej–Dholera semi-high-speed rail: approved
- Approved: Union Cabinet, 13 May 2026
- Specs: 134 km including spurs · design speed 200 km/h · ₹20,667 Cr (PIB)⁸
Sea ports within reach
| Port | Approx. road distance from Dholera | Notes |
|---|---|---|
| Ghogha | ~74 km | Nearest; Ghogha–Hazira Ro-Pax ferry link across the Gulf |
| Pipavav | ~200 km | Container and bulk; rail-connected |
| Kandla (Deendayal) | ~300 km | One of India's highest-volume major ports |
| Mundra | ~350 km | India's largest commercial port; container and bulk |
| Dahej · Hazira · JNPT | Accessible by road / WDFC | Chemicals, LNG and containers |
| New greenfield port | Proposed | Included in the India–UAE LoI (19 Jan 2026) |
Distances are approximate road distances from the Dholera awareness materials. Actual route distance varies by origin point within the SIR.
### 📍 See it on the ground The expressway, the ABCD building, the fab site and the airport perimeter can all be seen in one morning from Ahmedabad. Our site visits show you what's built today alongside the plots we offer.
Book a guided site visit · WhatsApp "Send me the Dholera plot list"
8. Sustainability and underground utilities
The activation area was built with its utilities underground and its resource systems planned from the start.
| System | What's in place | Status |
|---|---|---|
| Solar | Dholera Solar Park planned at 5,000 MW (1,000 MW Phase I + 4,000 MW Phase II, GPCL)⁹. Tata Power's 300 MW plant (India's largest single-axis tracker installation, ~774 MU/year) | 🟢 300 MW operating since Apr 2022 · 🟡 Park phases in progress |
| Water | 50 MLD water treatment plant · 100% wastewater recycling mandate · smart metering and SCADA | 🟢 Operational (activation area) |
| Industrial effluent | Common Effluent Treatment Plant (CETP), zero-discharge standard | 🟢 Operational |
| Stormwater | Rainwater capture, reuse for irrigation, 6 km earthen canal | 🟢 Operational |
| Solid waste | 100% collection; biodegradable waste composted | 🟢 Operational |
| Power | 24/7 supply, smart grid, renewable generation | 🟢 Operational |
| Desalination | Seawater desalination for industry, drinking water and agriculture | 🔵 Planned |
Seven networks run underground: potable water · recycled water · wastewater · stormwater · effluent collection · ICT · power distribution.
Planned against global benchmarks (per Government of India data shown in the awareness program):
| Road design | Urban planning | Power & ICT | Water | Solid waste | Stormwater |
|---|---|---|---|---|---|
| London · New York · Singapore | London · Chicago · Milton Keynes | Singapore · London · Canada & Denmark | Singapore · California · Hong Kong | Brussels · Songdo · New York | Brussels · Songdo · New York |
More detail: Dholera city highlights · ReNew and solar in Dholera
9. Industries: an ecosystem, not one factory
The Tata Electronics–PSMC semiconductor fab is Dholera's best-known anchor. Around it, gas suppliers, equipment partners, solar manufacturers and data-centre developers have made commitments. These range from operating plants to early-stage MoUs, and we label each one honestly.
On the ground in Dholera
Photographed on site: the Tata Electronics semiconductor site gate, fab construction cranes, the ReNew solar factory and the ABCD building.




Frames from on-site video footage in Dholera.
Status key: 🟢 Operational · 🟡 Under construction / land allotted · 🔵 MoU / LoI / announced
| Company | Sector | Key figure (official / verified) | Status |
|---|---|---|---|
| Tata Electronics + PSMC | Semiconductor fab | ₹91,000 Cr · 50,000 wafer starts/month · 66.166 ha SEZ notified 9 Apr 2026 · ~21,000 jobs¹⁰ | 🟡 Under construction |
| Tata Power Renewable Energy | Solar generation | 300 MW · ~774 MU/year | 🟢 Since Apr 2022 |
| ReNew | Solar cell & module manufacturing | 2.5 GW cell · 2.4 GW module | 🟢 Operating |
| INOX Air Products | Ultra-high-purity electronic gases | ₹500 Cr specialty-gas hub | 🟡 Under construction |
| Linde India | Industrial gases for the fab | Air separation unit | 🟡 Reported under development |
| Tokyo Electron | Fab equipment, training, R&D | Strategic partnership with Tata Electronics (Sep 2024) | 🔵 Partnership |
| AJU Group (Japan) | 5-star hotel | Won DICDL hotel-plot e-auction | 🟡 Plot allotted |
| L&T Vyoma | Green, AI-ready data centre | 250 MW · ₹25,000 Cr MoU (Feb 2026) | 🔵 MoU |
| Jabil | Electronics / silicon photonics | ₹1,000 Cr MoU | 🔵 MoU |
| Nextgen Hitech Semiconductor | SiC / Si power-semiconductor fab & ATMP | ₹8,800–10,000 Cr (reported) | 🔵 MoU |
| Grew Energy (Chiripal Group) | Solar cell & wafer | ₹3,800 Cr · 2.8 GW MoU | 🔵 MoU |
| Adani Defence & Aerospace + Embraer | E175 regional-jet assembly | Dholera reported as chosen site (Feb 2026) | 🔵 MoU |
| India–UAE | Airport, MRO, port, township, energy | Letter of Intent, 19 Jan 2026 | 🔵 LoI |
| AdaniConneX · Tillman Global | Hyperscale data centres | Large commitments reported (2026) | 🔵 Reported |
Policy tailwind: Gujarat's first Data Centre Policy, launched 9 July 2026, names Dholera a priority hub.
Full roster, sources and footnotes: Dholera Industrial Ecosystem 2026: Every Company, ₹ Commitment & Status The fab in depth: Tata Semiconductor Plant Dholera: Facts & the Ecosystem Around It
An MoU shows intent. It is not a finished project. The strongest signals are land allotment, central approval and visible construction.
10. Social infrastructure and tourism
Living and working in Dholera
| Facility | What it is | Status |
|---|---|---|
| ABCD Building (Administration cum Business Centre for Dholera) | DICDL/DSIRDA offices, single-window clearance, command & control centre; restaurant run by AJU Group | 🟢 Operational |
| Command & Control Centre | City-wide monitoring of utilities, traffic and safety | 🟢 Operational |
| Fire station | 11-garage station with rapid-response coverage | Planned |
| Multi-speciality hospital | 24/7 emergency, ICU and critical care | Planned |
| Integrated school | Primary to higher secondary, CBSE / IB curriculum | Planned |
| G-SER education hub (Gujarat Special Education Region) | Dedicated education zone of 1,000 acres, expandable to 5,000 | Planned |
| Gujarat Trade Centre (GTC) | Landmark business building with air, road and rail links | Planned |
Tourism within an hour
| Destination | Distance | Why it matters |
|---|---|---|
| National Maritime Heritage Complex (NMHC), Lothal | ~35 km | ₹4,500 Cr museum and heritage complex at the site of the Harappan-era port city. Phase 1A was about 82% complete in Sep 2026 (DD India) |
| Blackbuck National Park, Velavadar | ~35 km | 34.08 sq km grassland reserve (est. 1976), known for blackbuck, wolves and harriers |
11. Land and plots: how individuals invest in Dholera
Two different land markets:
- 1Industrial land inside the SIR is allotted by DICDL, mainly to companies such as those listed above.
- 2NA residential and commercial plots are sold by private developers in planned layouts in and around the SIR. This is how most individual investors take part.
Capital Brix's role: We are an authorised sales channel partner for Mirrikh Infratech Pvt. Ltd., a land developer active in Dholera since 2012. The projects are developed by Mirrikh Infratech Pvt. Ltd. and marketed by Capital Brix LLP. We provide buyer education, plot shortlisting, document review and site visits, from enquiry to registration.
Price guide (Mirrikh rate circular, 20 October 2026): under Mirrikh’s rate circular of 20 Oct 2026, residential plots start from ₹9,750 per sq yd and industrial plots from ₹8,950 per sq yd, with rates up to ₹15,000 per sq yd depending on the project. Rates vary with location, road frontage and distance to the expressway, airport and activation area. Typical extra costs on current Mirrikh projects include development charges (₹850/sq yd + GST), registration (about 5.9% of the consideration amount) and a sale-deed legal fee. Each project's cost sheet lists them in full. See current projects → · Dholera plot price 2026 explained →
Every plot we offer comes with its document file. This includes the NA order, a title search and the 7/12 extract, followed by sale-deed registration in your name. Review it yourself or with your lawyer before you pay a booking amount.
Five checks before you buy any Dholera plot
- 1NA status: a non-agricultural conversion order for the exact survey number
- 2Clear title: a title search covering at least 30 years, with no encumbrances
- 3Zoning: the plot's land-use zone and whether it falls inside or outside a TP scheme
- 4Location: actual road distance to the expressway, the airport and the activation area
- 5Registration: a registered sale deed, not just an agreement or allotment letter
Full checklist: How to Verify a Dholera Plot: NA, NOC, Title · NRIs: NRI Guide to Buying Land in Dholera
📄 Get the Dholera Plot Buyer Checklist (one page, free) → Download
12. The Sanand lesson (case study)
When Tata Motors moved its car plant to Sanand, near Ahmedabad, in 2008 (about 1,100 acres), the area turned into an automotive and industrial cluster within a decade.
| 2010 | 2020 | |
|---|---|---|
| 100 sq yd open plot in Sanand (as presented in the awareness program) | ₹70,000–80,000 | ₹16–18 lakh |
What this does and does not show: Sanand shows how an anchor factory can turn farmland into an industrial address. It is a historical illustration using figures from seminar materials. It is not a forecast for Dholera. Dholera is much larger, its plots vary widely in location, and land markets move in cycles. Judge any plot on its own location and paperwork.
For a balanced view of risks and upside, read Is Dholera a Good Investment? Honest Analysis.
Disclaimer: Figures from awareness materials and public announcements can change. Capex, project schedules and any appreciation examples are illustrative and are not guarantees of returns. Capital Brix does not promise or guarantee any return on investment. Verify plot-level NA/NOC/title and current DICDL / developer disclosures before booking.
13. Dholera FAQ
What is Dholera?
Dholera is a planned greenfield industrial smart city in Ahmedabad district, Gujarat, officially called the Dholera Special Investment Region (Dholera SIR). It covers 920 sq km and is the largest city being developed under the Delhi–Mumbai Industrial Corridor (DMIC).
Where is Dholera located?
Dholera is on the Gulf of Khambhat coast in Ahmedabad district, Gujarat, about 83 km (around 45 minutes) from Ahmedabad via the Ahmedabad–Dholera Expressway.
Is Dholera bigger than Singapore?
Yes. Dholera SIR covers 920 sq km. Singapore's land area is roughly 728–735 sq km.
Who is developing Dholera SIR?
The city's infrastructure is developed by Dholera Industrial City Development Ltd (DICDL), owned 51% by the Government of Gujarat and 49% by the Government of India. The Dholera Special Investment Region Development Authority (DSIRDA) is the regulator. Private developers build residential and commercial plotted projects in and around the SIR.
What is the Dholera activation area?
The activation area is the first developed zone of Dholera SIR, about 22.54 sq km in Town Planning Scheme 2. It has trunk roads, water treatment, effluent treatment, stormwater drains, power, ICT networks and the ABCD administrative building.
Is the Ahmedabad–Dholera Expressway open?
Yes. The Ahmedabad–Dholera Expressway opened to traffic in February 2026 and was inaugurated on 31 March 2026. The trip from Ahmedabad to Dholera takes about 45 minutes.
When will Dholera International Airport start operations?
The runway, taxiway and air traffic control are complete, and the first calibration aircraft landed in June 2026. Operations are targeted for late 2026, subject to DGCA licensing.
Is the Tata semiconductor plant in Dholera confirmed?
Yes. The Union Cabinet approved the Tata Electronics–PSMC fab on 29 February 2024 at ₹91,000 crore, and a 66.166-hectare SEZ for it was notified on 9 April 2026. Construction is under way in the activation area.
Which other companies are investing in Dholera?
Tata Power (300 MW solar) and ReNew (solar cell and module manufacturing) are operating. INOX Air Products and Linde are building gas facilities for the fab. L&T Vyoma, Jabil, Nextgen Hitech, Grew Energy and Adani–Embraer have signed MoUs, and India and the UAE signed a Letter of Intent for Dholera in January 2026.
Is there a railway to Dholera?
The Union Cabinet approved the 134 km Sarkhej–Dholera semi-high-speed rail line on 13 May 2026, at a cost of ₹20,667 crore and a design speed of 200 km/h.
Can individuals buy land in Dholera?
Yes. Individuals usually buy non-agricultural (NA) residential or commercial plots from private developers in and around the SIR. Industrial land inside the SIR is allotted by DICDL, mainly to companies.
What is the price of a plot in Dholera?
Prices depend on location, road frontage and distance to the expressway, airport and activation area. Under Mirrikh’s rate circular of 20 Oct 2026, residential plots start from ₹9,750 per sq yd and industrial plots from ₹8,950 per sq yd, with rates up to ₹15,000 per sq yd depending on the project, plus development, registration and legal charges.
Can NRIs buy plots in Dholera?
Yes. Under FEMA rules, NRIs and OCIs can buy residential and commercial non-agricultural plots in India. They cannot buy agricultural land, farmhouses or plantation property. Payment must come through normal banking channels, such as NRE, NRO or FCNR accounts.
What documents should I check before buying a Dholera plot?
Check the NA order for the survey number, a title search with no encumbrances and the 7/12 extract, and make sure the purchase is completed by a registered sale deed.
Is investing in Dholera guaranteed to give returns?
No. Infrastructure progress in Dholera is real and verifiable, but land prices depend on location, market cycles and project execution. No investment is guaranteed. Verify each plot's documents and choose a holding period that suits your goals.
14. See Dholera for yourself
Whether you are researching or ready to shortlist, start with what's real on the ground today.
| 💬 WhatsApp the desk | Get the current Mirrikh plot list, with distances to the expressway, airport and activation area → Open WhatsApp |
| 🚗 Book a site visit | A guided morning from Ahmedabad: expressway, ABCD building, fab site, airport perimeter → Book visit |
| 🎟️ Attend an awareness session | The full Dholera story, explained in person → Dholera Wealth 2026 |
| 📄 Download the checklist | One-page plot buyer checklist (NA, title, zoning) → Get checklist |
| 📞 Request a callback | A 15-minute call to see if Dholera suits your goals → Request callback |
Keep exploring: About Dholera SIR · Dholera overview & master plan · City highlights · Virtual tour · All Dholera guides
Sources and notes
How we verify: This page draws on the Dholera Awareness Program (the seminar presented by Mirrikh Infratech). We check each figure against official records (PIB, NICDC, DICDL/DSIRDA, JICA, MoRTH) and company releases. Where the awareness materials and official records differ, we use the official figure and note the difference below.
Deck vs official figures
- 1DMIC funding: The awareness deck says "74% Government of India via DMIC Trust / 26% Japan". In NICDC's shareholding, the 74% is the combined total of Indian public holders (GoI 49%, HUDCO 19.9%, IIFCL 4.1%, LIC 1%), and JBIC holds 26%.
- 2Western DFC: The deck says "operational 31 March 2026". The final sections were dedicated on 8 September 2026 (JICA), completing the ~1,506 km corridor. The deck gives 1,504 km.
- 3Delhi–Mumbai Expressway: The deck says 1,480 km with 1,169 km (~78%) operational. MoRTH told Parliament in March 2026 that the main alignment is 1,386 km (1,445 km with spurs), with 929 km open. More may have opened since.
- 4DMIC nodes: The deck's "11 industrial nodes" refers to the 11 Investment Regions out of 24 planned nodes.
- 5Dholera taluka: The deck dates the taluka to 26 January 2015. Gujarat announced the new taluka in September 2013, and 2015 may be when it became functional.
- 6Expressway distance: The deck says 71 km. PIB gives a total expressway length of ~109 km and an Ahmedabad–Dholera trip of 83 km / ~45 min. We use PIB.
- 7Airport runway: The deck says 4,000 m. The Phase-1 runway is 3,200 m (CAPA). 4,000 m matches the long-term master plan. The deck's operations date has been brought forward to late 2026 (target).
- 8Semi-HSR: The deck adds a ~48-minute journey and 284 villages connected. PIB's approval gives 134 km, 200 km/h and ₹20,667 Cr, which are the figures we use.
- 9Solar park: The deck says 4,400 MW, and some websites quote other figures. GPCL's official plan is 5,000 MW (1,000 MW + 4,000 MW).
- 10Fab jobs and output: The deck says 26,000 direct + 1 lakh indirect jobs and 300 crore chips/year. PIB's SEZ notification lists ~21,000 jobs. We found no official source for the chip count. The deck's production date has since been revised by MeitY; see our Tata fab guide for the latest official guidance.
Primary sources: PIB (DMIC 2007; activation-area trunk infrastructure 29 May 2015; airport 14 Jun 2022; Tata fab 29 Feb 2024; UAE LoI 19 Jan 2026; expressway 27 Feb 2026; fab SEZ 16 Apr 2026; semi-HSR 13 May 2026) · NICDC (Our Journey; corporate profile) · DICDL / DSIRDA (dholera.gujarat.gov.in; RTI proactive disclosure) · JICA (8 Sep 2026) · MoRTH Lok Sabha reply (Mar 2026) · GPCL Dholera Solar Park · Tata Power · Tata Electronics · INOX Air Products · DD India (NMHC, Sep 2026) · Gujarat Data Centre Policy GR (Jul 2026).
Figures were checked on 6 October 2026 (IST). Dholera changes quickly, and we update this page when official milestones move.
Disclaimer: Capital Brix is an authorised sales channel partner for Mirrikh Infratech Pvt. Ltd.. This page is for information only and is not financial advice. Investment figures, project schedules and examples come from public announcements and awareness materials and can change. No return on any investment is promised or guaranteed. Verify plot-level NA/NOC/title and current DICDL / developer disclosures before booking.